Tools
Commercial Feasibility
A high-level model for a commercial rooftop scheme. It is deliberately simple — its job is to tell you whether a proper feasibility study is worth commissioning.
Inputs
Your site
The share of generation consumed on site. Daytime-heavy operations sit high; weekday offices with summer shutdowns sit lower.
Result
Indicative commercial feasibility
A screening-level model from the inputs on this page. Indicative only — not a quotation, feasibility study or guaranteed return.
Indicative system size250 kWp
- Annual generation
- 225,000 kWh
- Indicative capex
- £187,500
- Annual benefit
- £43,200
- Simple payback
- 4.3 yrs
- CO₂ avoided
- 46.6 t/yr
Assumptions and caveats
Approximately 6 m² of roof per kWp, 900 kWh per kWp per year, and no allowance for structural works, grid reinforcement, roof condition or finance costs. Simple payback ignores inflation, degradation and maintenance. Capex, savings and payback are indicative and not guaranteed.
Recommended next action
If the screening case looks viable, the next step is a proper feasibility study using half-hourly consumption data, a structural view of the roof and a grid capacity check. Installation work is delivered by our network of MCS-certified installation partners.
Next step
Send us the site and we will model it properly
Your figures above are passed through with the enquiry, so we start from what you have already modelled.
Loading form…
Commission a proper feasibility study
We use half-hourly consumption data, a structural view of the roof and a real grid capacity check.